Kharrazi Main M&R Gas Station

Main Gas M&R Station of Kharrazi Area of Mobarakeh Steel Complex

  • Main Gas Supply system, Capacity: 200,000 m³/h
  • Inlet pressure: 1,100 Psi, Outlet pressures: 450 Psi
  • Project value: $8 Million
  • Contract Duration: 12 Months
  • E.P.C. services
  • Progress:  35%
Gas Pipelines Relocation of MSC

Gas Pipeline Relocation of Mobarakeh Steel Complex

  • Inlet pressure: 435 Psi & 175 Psi
  • Project value: $ 3 Million
  • Contract Duration: 9 Months
  • E.P.C. services
  • Progress:  15%
Naein-Kashan-Rey Oil Pipeline

Naein-Kashan-Rey Oil Pipeline

  • Engineering, Procurement, Construction and Commissioning of the 450 Km, 20″ Oil Pipeline , Including not limited to Compressor Stations, Tank Farms , Launcher & Receiver stations
  • Pipe Size: 20 Inch
  • Length: 450 Km
  • Total project value: $130 million
  • Contract Duration: 36 months
  • Engineering, Procurement and Construction services
  • Client: – National Iranian Oil Engineering & Construction Co.
  • Progress: 45%

Disulfide Oil Fractionation Project(DSOF)
Disulfide Oil Fractionation Project(DSOF)  By-Product Recovery Project 

  • Disulfide oil  (DSO) fractionation pilot plant.
  • DSO is an undesired by-product of south pars phases 2 &3
  • The first unit of its kind
  • Project value: $6 million
  • Contract Duration 18 Months
  • E.P.C. services
  • Client: Pars Oil & Gas Co. (P.O.G.C)
  • Progress: 87%

Completed

Sarchesh-Kerman Gas Pipe Line

Sarcheshmeh-Kerman Gas Pipe Line

  • Procurement and Construction of the Pipeline from Sarcheshmeh to Kerman
  • Pipe Size: 30 Inch
  • Length: 85 Km
  • Total project value: $14 million
  • Procurement and Construction services
  • Client: – National Iranian Gas Engineering and Development Co.

Arsanjan-Kerman Gas Pipe Line
Arsanjan-Kerman Gas Pipeline and Launcher / Receiver construction

  • Construction of the Pipeline from Arsanjan to Kerman with related Launcher and Receiver stations
  • Pipe Size: 42 Inch
  • Length: 70 Km
  • No. of Stations: 3 Units
  • Total project value: $5 million
  • Construction services
  • Client: – National Iranian Gas Engineering and Development Co.

Pars Petrochemical Special Economic Zone

Pars Petrochemical Special Economic  Zone (Phases I and II)

  • Main Gas Supply system, Capacity: 4 MMMSCFD
  • Inlet pressure: 1,300 Psi, Outlet pressure: 825 Psi
  • Fuel and feed supply to 30 petrochemical plants
  •  Project value for phases I and II: $15 million
  • Technical & procurement engineering services
  • Construction supervision services

Mahshahr Special Petrochemical Economic Zone
Mahshahr Special Petrochemical Economic Zone (Phases I and II)

  • Main Gas Supply system, Capacity: 1 MMMSCFD
  • Inlet pressure: 1,100 Psi, Outlet pressure: 450 Psi
  • Fuel and feed supply to 20 petrochemical plants
  •  Project value for phases I and II: $10 million
  • Technical & procurement engineering services
  • Construction supervision services
  • Construction services

Mobarakeh Steel Complex
Mobarakeh Steel Complex

  • Main Gas Supply system, Capacity: 350 MMSCFD
  • Inlet pressure: 1,100 psi, Outlet pressures: 450 and 180 Psi
  • Project value for phases I and II: $15 million
  • Technical & procurement engineering services
  • Construction supervision services
  • E.P.C. services
Earthquake Sensing Gas Shut-off Box

Earthquake Sensing Gas Shut-off Box 

  • New product development Jointly with Matsushita and Toyota from Japan
  • Intelligent design, only responds to actual earthquake foreshocks
  • Estimated domestic demand: 10 million (units) over the next  10 years
  • Estimated project value : $400 million
  • Engineering, Manufacturing, Installation, and after sales services
  • Client: –  National Iranian Gas Co.(NIGC)
Gas Sweetening By-Sulfur Removal Unit (SRU)

Gas Sweetening By-Sulfur Removal Unit (SRU) Project

  •  A complete Liquid Sulfur Removal Unit- including C3+ and C5+ in order to prepare feedstock of the Olefin.
  • The UNIT shall consist of necessary facilities  to produce 453.3 KTPA sulfur free C3+ and 470 KTPA sulfur free C5+ up to maximum 60 PPM and 200 PPM sulfur content respectively as PRODUCT.
  • The mentioned capacity figures are technically designed with normal operation figures are 328KTPA C3+and 392KTPA C5+.
  • Project value: $50 million
  • Contract Duration 26 Months
  • E.P.C. services
  • Client: – Ilam Petrochemical Co.
  • Progress: 20%
Salman and Mirza Sugar Cane Power Plants

Salman & Mirza Sugar Cane Power Plants

  • Piping, Instrument, Electrical, monitoring, firefighting and control systems & Commissioning
  • Capacity: 4 x 165 Ton/hr steam boilers and accessories
  • Total project value: $1 million
  • Construction services

 